DocumentCode
1488509
Title
Response of thermal demand meters
Author
Nelson, J. S.
Author_Institution
General Electric Company, West Lynn, Mass.
Volume
68
Issue
12
fYear
1949
Firstpage
1046
Lastpage
1046
Abstract
THE TIME OF RESPONSE of demand meters is of critical importance wherever a demand charge is made for electricity. In demand meters of the mechanical block-interval type the demand interval is usually governed by a gear train and resetting mechanism connected with some synchronous device, such as a clock motor, and response time presents no special problems in design. The response time of thermal meters depends upon less easily evaluated constants and coefficients. This article examines these factors and presents equations from which the time of response may be calculated.
Keywords
Equations; Heating; Instruments; Mathematical model; Spirals; Thermal conductivity; Time factors;
fLanguage
English
Journal_Title
Electrical Engineering
Publisher
ieee
ISSN
0095-9197
Type
jour
DOI
10.1109/EE.1949.6443275
Filename
6443275
Link To Document