• DocumentCode
    1491538
  • Title

    Operation in metallurgical and chemical plants

  • Author

    Dickinson, A. G.

  • Author_Institution
    Consolidated Mining and Smelting Company of Canada, Ltd., Trail, British Columbia
  • Volume
    66
  • Issue
    10
  • fYear
    1947
  • Firstpage
    960
  • Lastpage
    962
  • Abstract
    CONSOLIDATED Mining and Smelting Company of Canada, Ltd., metallurgical and chemical plants, located at Trail, British Columbia, have a total load of 180,000 kw of which 80 per cent is converted to direct current for use in electrolytic processes. The first rectifier installation went into operation in 1929. Further installations have been added and now 70 per cent of the installed conversion equipment consists of mercury-arc rectifiers.
  • Keywords
    Circuit breakers; Hydrogen; Maintenance engineering; Oil insulation; Rectifiers; Voltage control; Zinc;
  • fLanguage
    English
  • Journal_Title
    Electrical Engineering
  • Publisher
    ieee
  • ISSN
    0095-9197
  • Type

    jour

  • DOI
    10.1109/EE.1947.6443763
  • Filename
    6443763