Title :
Dielectric testing of solid insulation with respect to insulation coordination of low-voltage equipment
Author_Institution :
Darmstadt Univ. of Technol., Germany
Abstract :
In real insulation systems with solid insulation, partial discharges usually occur far below the breakdown voltage. In the long run, these lead to the destruction of nearly all solid insulating materials. The question, How much time has passed until the partial discharges have destroyed the solid insulation?, is of little relevance in low-voltage equipment since the occurrence of partial discharge during normal use will, in general not allow a sufficient lifetime. Moreover, the results of such lifetime investigations are influenced by many parameters; therefore, statements with general validity cannot be made.
Keywords :
dielectric measurement; electric breakdown; insulation co-ordination; insulation testing; partial discharge measurement; breakdown voltage; dielectric testing; insulation coordination; low-voltage equipment; partial discharge; solid insulation; Breakdown voltage; Circuit testing; Conductive films; Dielectrics and electrical insulation; Electric breakdown; Gas insulation; Insulation testing; Partial discharges; Solids; Stress;
Journal_Title :
Electrical Insulation Magazine, IEEE