DocumentCode :
1495434
Title :
Electrification of an Ore Haulage system
Author :
Corfield, R. J.
Author_Institution :
Kennecott Copper Corporation, Utah Copper Division, Garfield, Utah
Volume :
67
Issue :
10
fYear :
1948
Firstpage :
994
Lastpage :
994
Abstract :
Approximately 28 single track or 17.5 route miles of electrified railroad constructed for the specific purpose of hauling 30 million tons of relatively low grade copper-bearing ore between the open pit mine at Bingham Canyon, Utah, and the two copper concentrators located at Garfield, Utah, were placed in operation on May 1, 1948.
Keywords :
Copper; Electronic ballasts; Poles and towers; Rail transportation; Rails; Slag; Substations;
fLanguage :
English
Journal_Title :
Electrical Engineering
Publisher :
ieee
ISSN :
0095-9197
Type :
jour
DOI :
10.1109/EE.1948.6444392
Filename :
6444392
Link To Document :
بازگشت