Title :
Planning a large all-hydroelectric system
Author :
Ward, M. ; Smith, H. A.
Author_Institution :
Hydro-Electric Power Commission of Ontario, Toronto, Ontario, Canada
Abstract :
This article presents a summary of the development of the all-hydroelectric Southern Ontario system of the Hydro-Electric Power Commission of Ontario, in Canada, and discusses the major factors to be considered in planning this type of electric power supply system.
Keywords :
Cities and towns; Frequency conversion; IEEE transactions; Planning; Rivers; Sociology; Statistics;
Journal_Title :
Electrical Engineering
DOI :
10.1109/EE.1949.6444601