Title :
Continuous winding temperature tests under load
Author :
Lockie, A. M. ; Stein, G. M.
Author_Institution :
Westinghouse Electric Corporation, Sharon, Pa.
fDate :
4/1/1949 12:00:00 AM
Abstract :
IN the standard method for making temperature tests of transformers, the average winding rises are computed from resistance measurements taken after shutdown. This procedure becomes inaccurate when high or rapidly changing temperatures are involved, as in rated-load tests on certain dry-type transformers or in overload tests on oil-immersed apparatus.
Keywords :
Bridge circuits; Current measurement; Electric potential; Heating; Oil insulation; Temperature measurement; Windings;
Journal_Title :
Electrical Engineering
DOI :
10.1109/EE.1949.6444717