DocumentCode :
1498657
Title :
Postwar planning for high-voltage transmission in Northern California
Author :
Johnson, W. R.
Author_Institution :
Division of Hydroelectric and Transmission Engineering of the Pacific Gas and Electric Company, San Francisco, Calif.
Volume :
68
Issue :
8
fYear :
1949
Firstpage :
650
Lastpage :
655
Abstract :
Topography and climate have proved large factors in the planning of generation and transmission facilities for the Pacific Gas and Electric Company. Steam and hydroelectric generating capacity is being increased 1,300,000 kw; 1,400 miles of new 230-kv transmission lines are to be added to provide improved service to a 90,000-square-mile area.
Keywords :
Companies; Integrated circuit interconnections; Planning; Rivers; Storage area networks; Substations;
fLanguage :
English
Journal_Title :
Electrical Engineering
Publisher :
ieee
ISSN :
0095-9197
Type :
jour
DOI :
10.1109/EE.1949.6444914
Filename :
6444914
Link To Document :
بازگشت