DocumentCode
1502785
Title
Intermediate gas turbine pumping units of trans-arabian pipe line company
Author
Nibley, P. P. ; Hillman, A. Y.
Author_Institution
Trans-Arabian Pipe Line Co., New York, N. Y.
Volume
77
Issue
2
fYear
1958
Firstpage
158
Lastpage
162
Abstract
The design requirements of unattended gas turbine pumping units in the Arabian desert under supervisory control from bases 50 to 90 miles away posed a heavy engineering challenge. The novel problems and their solution are described.
Keywords
Batteries; Companies; Generators; Pipelines; Process control; Shafts; Turbines;
fLanguage
English
Journal_Title
Electrical Engineering
Publisher
ieee
ISSN
0095-9197
Type
jour
DOI
10.1109/EE.1958.6445622
Filename
6445622
Link To Document