DocumentCode :
1502785
Title :
Intermediate gas turbine pumping units of trans-arabian pipe line company
Author :
Nibley, P. P. ; Hillman, A. Y.
Author_Institution :
Trans-Arabian Pipe Line Co., New York, N. Y.
Volume :
77
Issue :
2
fYear :
1958
Firstpage :
158
Lastpage :
162
Abstract :
The design requirements of unattended gas turbine pumping units in the Arabian desert under supervisory control from bases 50 to 90 miles away posed a heavy engineering challenge. The novel problems and their solution are described.
Keywords :
Batteries; Companies; Generators; Pipelines; Process control; Shafts; Turbines;
fLanguage :
English
Journal_Title :
Electrical Engineering
Publisher :
ieee
ISSN :
0095-9197
Type :
jour
DOI :
10.1109/EE.1958.6445622
Filename :
6445622
Link To Document :
بازگشت