• DocumentCode
    1502785
  • Title

    Intermediate gas turbine pumping units of trans-arabian pipe line company

  • Author

    Nibley, P. P. ; Hillman, A. Y.

  • Author_Institution
    Trans-Arabian Pipe Line Co., New York, N. Y.
  • Volume
    77
  • Issue
    2
  • fYear
    1958
  • Firstpage
    158
  • Lastpage
    162
  • Abstract
    The design requirements of unattended gas turbine pumping units in the Arabian desert under supervisory control from bases 50 to 90 miles away posed a heavy engineering challenge. The novel problems and their solution are described.
  • Keywords
    Batteries; Companies; Generators; Pipelines; Process control; Shafts; Turbines;
  • fLanguage
    English
  • Journal_Title
    Electrical Engineering
  • Publisher
    ieee
  • ISSN
    0095-9197
  • Type

    jour

  • DOI
    10.1109/EE.1958.6445622
  • Filename
    6445622