DocumentCode :
1506163
Title :
Zig-zag configuration for ring-bus substation
Author :
Connelly, R. N. ; Gibbons, R. F.
Author_Institution :
Sacramento Municipal Utility District, Sacramento, Calif.
Volume :
78
Issue :
2
fYear :
1959
Firstpage :
147
Lastpage :
147
Abstract :
THE NEW HEDGE SUBSTATION of Sacramento Municipal Utility District, located a few miles southeast of Sacramento, Calif., is designed to receive firming power over two lines from Pacific Gas and Electric Company plus substantial amounts of power from the U. S. Bureau of Reclamation Central Valley Project and from the new Upper American River Project, all at number of disconnecting switches and insulation points is small; extra buses are not required; relaying is not overly difficult; and when a line is disconnected the ring may still be closed.
Keywords :
Associate members; Circuit breakers; Companies; Insulation; Joining processes; Rivers; Substations;
fLanguage :
English
Journal_Title :
Electrical Engineering
Publisher :
ieee
ISSN :
0095-9197
Type :
jour
DOI :
10.1109/EE.1959.6446206
Filename :
6446206
Link To Document :
بازگشت