    A comparison of actual and allocated costs for work accomplished using NASA PERT

  • Author

    Walker, J. D. ; Houry, E.

  • Author_Institution
    Lewis Pesearch Center, XASA, Cleveland, Ohio
  • Issue
    3
  • fYear
    1965
  • Firstpage
    93
  • Lastpage
    102
  • Abstract
    A system for more objectively evaluating a contractor´s performance on cost type contracts is described. The technique utilizes the existing NASA PERT and Companion Cost System without imposing any additional reporting requirements upon the contractor. Evaluation is obtained by a cost index which is calculated monthly and is a comparison of the contractor´s actual costs incurred with baseline allocated costs. The allocated costs result from a reasonable distribution or allocation of the contractor´s initial cost proposal dollars to activities reflecting this proposal in PERT fragnets. After this initial allocation, the computer calculates with each normal PERT Time updating, the allocated costs, or the total-resources-allocated-for-work-accomplished through the report date. The results of a pilot test case using the cost index are presented.
  • Keywords
    Computers; Contracts; Generators; Indexes; NASA; Resource management; Valves;
  • fLanguage
    English
  • Journal_Title
    Engineering Management, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9391
  • Type

    jour

  • DOI
    10.1109/TEM.1965.6446456
  • Filename
    6446456