DocumentCode :
1512766
Title :
Engineering information release prior to final design freeze
Author :
Eastman, R.M.
Author_Institution :
Dept. of Industrial Engng., Univ. of Missouri-Columbia, Columbia, MO, USA
Issue :
2
fYear :
1980
fDate :
5/1/1980 12:00:00 AM
Firstpage :
37
Lastpage :
42
Abstract :
The purpose of the research was to develop methods for shortening the procurement time for complex components by releasing some engineering information prior to the final design freeze. The investigation covered review and analysis of records of engineering and procurement at a major defense contractor, interviews with key contractor personnel, and a literature search. The study, concluded that early release of engineering information should be used only if necessary to meet schedule requirements and if carefully controlled.
Keywords :
management; project engineering; complex components; design freeze; engineering information; procurement time; Companies; Manufacturing; Materials; Procurement; Production; Schedules;
fLanguage :
English
Journal_Title :
Engineering Management, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9391
Type :
jour
DOI :
10.1109/TEM.1980.6447387
Filename :
6447387
Link To Document :
بازگشت