DocumentCode
1513648
Title
Integrated management in matrix organization
Author
Wall, W.C.
Author_Institution
WCW Associates Inc., Huntsville, AL, USA
Issue
1
fYear
1984
Firstpage
30
Lastpage
36
Abstract
Effective project management requires that all planning and management control activities be fully integrated. Planning must encompass operational, tactical, and strategic considerations; functionally oriented efforts must be properly blended into a unified whole; and project technical performance, cost, and schedule parameters must be integrated into a systemic composite. Viewed from this perspective, integrated management has both an organizational component and a program component that are distinct yet interrelated. The conceptual basis of these two components of integrated management are explored from a systemic viewpoint.
Keywords
research and development management; scheduling; cost; functionally oriented efforts; integrated management; management control activities; matrix organization; organizational component; planning; project management; schedule parameters; strategic considerations; Electric breakdown; Humans; Organizations; Personnel; Project management; Schedules;
fLanguage
English
Journal_Title
Engineering Management, IEEE Transactions on
Publisher
ieee
ISSN
0018-9391
Type
jour
DOI
10.1109/TEM.1984.6447555
Filename
6447555
Link To Document