• DocumentCode
    1513648
  • Title

    Integrated management in matrix organization

  • Author

    Wall, W.C.

  • Author_Institution
    WCW Associates Inc., Huntsville, AL, USA
  • Issue
    1
  • fYear
    1984
  • Firstpage
    30
  • Lastpage
    36
  • Abstract
    Effective project management requires that all planning and management control activities be fully integrated. Planning must encompass operational, tactical, and strategic considerations; functionally oriented efforts must be properly blended into a unified whole; and project technical performance, cost, and schedule parameters must be integrated into a systemic composite. Viewed from this perspective, integrated management has both an organizational component and a program component that are distinct yet interrelated. The conceptual basis of these two components of integrated management are explored from a systemic viewpoint.
  • Keywords
    research and development management; scheduling; cost; functionally oriented efforts; integrated management; management control activities; matrix organization; organizational component; planning; project management; schedule parameters; strategic considerations; Electric breakdown; Humans; Organizations; Personnel; Project management; Schedules;
  • fLanguage
    English
  • Journal_Title
    Engineering Management, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9391
  • Type

    jour

  • DOI
    10.1109/TEM.1984.6447555
  • Filename
    6447555