DocumentCode
151687
Title
Supervision of circuit-switchers state via image processing
Author
de Oliveira, A.L. ; Magrini, L.C. ; Kim, Hyung Yoon ; Kviatkowski, M.A.
Author_Institution
FDTE, Sao Paulo, Brazil
fYear
2014
fDate
10-13 Sept. 2014
Firstpage
1
Lastpage
6
Abstract
One of the barriers in remote operation of circuit-switchers installed in subtransmission lines is to be aware of the actual conditions of each of the poles of the circuit-switcher, as well as confirmation of the success, or failure, of the operation. Often the visual confirmation of the maneuver is part of the procedure, requiring the displacement of the ground crew and creating schedule delays. A monitoring system was developed for circuit-switchers based on an algorithm to detect the state of the circuit-switcher, open or closed, from the digital processing of images captured after the maneuver.
Keywords
computerised monitoring; image processing; power engineering computing; power system measurement; power transmission lines; scheduling; switchgear; synchronisation; circuit switchers state; digital processing; image processing; monitoring system; schedule delays; subtransmission lines; Cameras; Histograms; Image color analysis; Lighting; Switches; Switching circuits; Vectors; Substation automation system; circuit-switcher; image processing system;
fLanguage
English
Publisher
ieee
Conference_Titel
Transmission & Distribution Conference and Exposition - Latin America (PES T&D-LA), 2014 IEEE PES
Conference_Location
Medellin
Print_ISBN
978-1-4799-6250-1
Type
conf
DOI
10.1109/TDC-LA.2014.6955183
Filename
6955183
Link To Document