DocumentCode :
1518037
Title :
Resource analyses for R&D programs
Author :
Dodson, E.N.
Author_Institution :
General Res. Corp., Santa Barbara, CA, USA
Issue :
3
fYear :
1972
Firstpage :
78
Lastpage :
86
Abstract :
Two studies of R&D resource requirements are discussed. The first includes a procedure for measuring state-of-the-art advance and incorporating the measure in an estimating relationship for development cost and time. The second study includes a procedure for evaluating management strategies in terms of time, cost, and risk.
Keywords :
research and development management; R and D programs; management strategies; resource analyses; Mathematical model; Production; Schedules; Semiconductor optical amplifiers; Surface fitting; Surface treatment; Time measurement;
fLanguage :
English
Journal_Title :
Engineering Management, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9391
Type :
jour
DOI :
10.1109/TEM.1972.6448386
Filename :
6448386
Link To Document :
بازگشت