DocumentCode
1518037
Title
Resource analyses for R&D programs
Author
Dodson, E.N.
Author_Institution
General Res. Corp., Santa Barbara, CA, USA
Issue
3
fYear
1972
Firstpage
78
Lastpage
86
Abstract
Two studies of R&D resource requirements are discussed. The first includes a procedure for measuring state-of-the-art advance and incorporating the measure in an estimating relationship for development cost and time. The second study includes a procedure for evaluating management strategies in terms of time, cost, and risk.
Keywords
research and development management; R and D programs; management strategies; resource analyses; Mathematical model; Production; Schedules; Semiconductor optical amplifiers; Surface fitting; Surface treatment; Time measurement;
fLanguage
English
Journal_Title
Engineering Management, IEEE Transactions on
Publisher
ieee
ISSN
0018-9391
Type
jour
DOI
10.1109/TEM.1972.6448386
Filename
6448386
Link To Document