• DocumentCode
    1530579
  • Title

    Building high performing engineering project teams

  • Author

    Thamhain, Hans J. ; Wilemon, David L.

  • Author_Institution
    Department of Management, Worcester, Polytechnic Institute, Worcester, MA 01609; Bentley College, Waltham, MA 02154
  • Issue
    3
  • fYear
    1987
  • Firstpage
    130
  • Lastpage
    137
  • Abstract
    This article summarizes four years of research into the drivers and barriers of effective teambuilding in engineering work environments. A simple input-output model is presented for organizing and analyzing the various factors which influence team performance. The field survey results supported by correlation analysis indicate that team performance is primarily associated with six driving forces and six barriers which are related to: leadership, job content, personal needs, and general work environment. Specific recommendations are made.
  • Keywords
    Collaboration; Organizing; Personnel; Planning; Strategic planning; Teamwork; Team building in engineering; drivers and barriers to team performance; organizing multidisciplinary work groups; project management; technical leadership style; technical management skills; technical team work;
  • fLanguage
    English
  • Journal_Title
    Engineering Management, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9391
  • Type

    jour

  • DOI
    10.1109/TEM.1987.6498873
  • Filename
    6498873