DocumentCode :
1536416
Title :
Goal programming approach to maintenance scheduling of generating units in large scale power systems
Author :
Moro, Lucía Muñoz ; Ramos, Andrés
Author_Institution :
Inst. de Invest. Tecnologica, Univ. Pontifica Comillas, Madrid, Spain
Volume :
14
Issue :
3
fYear :
1999
fDate :
8/1/1999 12:00:00 AM
Firstpage :
1021
Lastpage :
1028
Abstract :
This paper presents a goal programming methodology for solving maintenance scheduling of thermal generating units under economic and reliability criteria. The advantages of a multicriteria approach are demonstrated by comparing the effects that costs and reliability have on each other in power plants maintenance scheduling. The problem is formulated as a large scale mixed integer programming problem implemented in the mathematical programming language GAMS and solved using OSL. Weekly maintenance scheduling of the large scale Spanish power system for a year period illustrates the proposed methodology
Keywords :
integer programming; maintenance engineering; power generation planning; scheduling; thermal power stations; GAMS mathematical programming language; OSL; Spain; costs; goal programming approach; large-scale mixed integer programming problem; large-scale power systems; maintenance scheduling; multicriteria approach; reliability; thermal generating units; weekly maintenance; Constraint optimization; Costs; Large-scale systems; Maintenance; Power generation; Power system modeling; Power system planning; Power system reliability; Power systems; Scheduling;
fLanguage :
English
Journal_Title :
Power Systems, IEEE Transactions on
Publisher :
ieee
ISSN :
0885-8950
Type :
jour
DOI :
10.1109/59.780915
Filename :
780915
Link To Document :
بازگشت