DocumentCode
1537457
Title
Multiple-part cyclic hoist scheduling using a sieve method
Author
Kats, Vladimir ; Levner, Eugene ; Meyzin, Leonid
Author_Institution
Ben-Gurion Univ. of the Negev, Beer-Sheva, Israel
Volume
15
Issue
4
fYear
1999
fDate
8/1/1999 12:00:00 AM
Firstpage
704
Lastpage
713
Abstract
The paper proposes an algorithm for generating optimal cyclic schedules of hoist moves in a printed circuit board electroplating facility where transportation of parts between workstations is performed by a computer-controlled hoist. The objective of the scheduling problem is to maximize the throughput rate. Unlike many previous algorithms which consider 1-part cyclic schedules, the proposed algorithm provides an exact solution for the more complicated case of r-part cyclic schedules where r>1. The algorithm is illustrated with numerical examples comparing 1-part and multiple-part optimal schedules
Keywords
materials handling; mathematical programming; printed circuit manufacture; production control; transportation; PCB electroplating; cyclic hoist; deterministic cyclic scheduling; materials handling; mathematical programming; optimisation; parts transportation; printed circuit board; robotic cells; scheduling; sieve method; Chemical processes; Job shop scheduling; Materials handling; Optimal scheduling; Printed circuits; Processor scheduling; Production; Robots; Scheduling algorithm; Throughput;
fLanguage
English
Journal_Title
Robotics and Automation, IEEE Transactions on
Publisher
ieee
ISSN
1042-296X
Type
jour
DOI
10.1109/70.781993
Filename
781993
Link To Document