• DocumentCode
    1537457
  • Title

    Multiple-part cyclic hoist scheduling using a sieve method

  • Author

    Kats, Vladimir ; Levner, Eugene ; Meyzin, Leonid

  • Author_Institution
    Ben-Gurion Univ. of the Negev, Beer-Sheva, Israel
  • Volume
    15
  • Issue
    4
  • fYear
    1999
  • fDate
    8/1/1999 12:00:00 AM
  • Firstpage
    704
  • Lastpage
    713
  • Abstract
    The paper proposes an algorithm for generating optimal cyclic schedules of hoist moves in a printed circuit board electroplating facility where transportation of parts between workstations is performed by a computer-controlled hoist. The objective of the scheduling problem is to maximize the throughput rate. Unlike many previous algorithms which consider 1-part cyclic schedules, the proposed algorithm provides an exact solution for the more complicated case of r-part cyclic schedules where r>1. The algorithm is illustrated with numerical examples comparing 1-part and multiple-part optimal schedules
  • Keywords
    materials handling; mathematical programming; printed circuit manufacture; production control; transportation; PCB electroplating; cyclic hoist; deterministic cyclic scheduling; materials handling; mathematical programming; optimisation; parts transportation; printed circuit board; robotic cells; scheduling; sieve method; Chemical processes; Job shop scheduling; Materials handling; Optimal scheduling; Printed circuits; Processor scheduling; Production; Robots; Scheduling algorithm; Throughput;
  • fLanguage
    English
  • Journal_Title
    Robotics and Automation, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    1042-296X
  • Type

    jour

  • DOI
    10.1109/70.781993
  • Filename
    781993