Abstract :
I agree with you that both the NRC and the utilities could be considered criminally lax in the handling of their responsibility, but I feel that all the variables must be examined when evaluating the energy option. Your approach would be equivalent to calculating the line to ground fault on a transmission line without considering the effect of the zero sequence component. You would arrive at the correct mathematical solution. Your answer just would not reflect the real world.