DocumentCode :
1540981
Title :
Completion and trial operation of the superconducting magnets for the Large Helical Device
Author :
Satow, T. ; Yanagi, N. ; Imagawa, S. ; Tamura, H. ; Takahata, K. ; Mito, T. ; Chikaraishi, H. ; Yamada, S. ; Nishimura, A. ; Maekawa, R. ; Iwamoto, A. ; Inoue, N. ; Nakamura, Y. ; Watanabe, K. ; Yamada, H. ; Komori, A. ; Ohtake, I. ; Iima, Makoto ; Satoh,
Author_Institution :
Nat. Inst. for Fusion Sci., Nagoya, Japan
Volume :
9
Issue :
2
fYear :
1999
fDate :
6/1/1999 12:00:00 AM
Firstpage :
1008
Lastpage :
1011
Abstract :
The Large Helical Device (LHD) is a plasma physics experimental device having two superconducting helical coils and three pairs of poloidal coils. All assembly and attachment works of LHD were completed in January 1998. The trial operation and the first plasma ignition of the eight-year Phase I project for LHD were finished in March just as planned. After that time the first cycle plasma experiment was carried on at a plasma central field of 1.5 T. The second cycle experiment is now conducted. The LHD magnets will be excited to a central field of 3.0 T in December 1998.
Keywords :
fusion reactor design; stellarators; superconducting coils; superconducting magnets; 1.5 T; 3 T; Large Helical Device; eight-year Phase I project; first plasma ignition; plasma central field; plasma physics experimental device; poloidal coils; superconducting helical coils; superconducting magnets; trial operation; Assembly; Conductors; Critical current; Current density; Ignition; Physics; Plasma devices; Superconducting coils; Superconducting magnets;
fLanguage :
English
Journal_Title :
Applied Superconductivity, IEEE Transactions on
Publisher :
ieee
ISSN :
1051-8223
Type :
jour
DOI :
10.1109/77.783469
Filename :
783469
Link To Document :
بازگشت