Title :
Using on line insulation testing to implement generator predictive maintenance
Author_Institution :
8247 North Lick Creek Rd., Lyles, TN, USA
Abstract :
Aspects of preventive and predictive maintenance for a hydrogenerator stator winding insulation system are discussed in this article. A specific case study on a 31 MVA hydrogenerator is presented. The new method had to provide the staff with a precise and timely assessment of the state of the insulation without prolonged outages and substantial manpower allocations.
Keywords :
hydroelectric generators; insulation testing; machine insulation; machine testing; maintenance engineering; stators; 31 MVA; hydrogenerator stator winding; on line insulation testing; predictive maintenance; preventive maintenance; Aging; Capacitance; Condition monitoring; Dielectrics and electrical insulation; Inspection; Insulation testing; Manufacturing; Predictive maintenance; Preventive maintenance; Stator windings;
Journal_Title :
Electrical Insulation Magazine, IEEE