DocumentCode :
1543139
Title :
Using on line insulation testing to implement generator predictive maintenance
Author :
Warren, V.
Author_Institution :
8247 North Lick Creek Rd., Lyles, TN, USA
Volume :
13
Issue :
2
fYear :
1997
Firstpage :
17
Lastpage :
21
Abstract :
Aspects of preventive and predictive maintenance for a hydrogenerator stator winding insulation system are discussed in this article. A specific case study on a 31 MVA hydrogenerator is presented. The new method had to provide the staff with a precise and timely assessment of the state of the insulation without prolonged outages and substantial manpower allocations.
Keywords :
hydroelectric generators; insulation testing; machine insulation; machine testing; maintenance engineering; stators; 31 MVA; hydrogenerator stator winding; on line insulation testing; predictive maintenance; preventive maintenance; Aging; Capacitance; Condition monitoring; Dielectrics and electrical insulation; Inspection; Insulation testing; Manufacturing; Predictive maintenance; Preventive maintenance; Stator windings;
fLanguage :
English
Journal_Title :
Electrical Insulation Magazine, IEEE
Publisher :
ieee
ISSN :
0883-7554
Type :
jour
DOI :
10.1109/57.583422
Filename :
583422
Link To Document :
بازگشت