• DocumentCode
    1544548
  • Title

    Reliability centered maintenance for transmission systems

  • Author

    Beehler, M.E.

  • Author_Institution
    Burns & McDonnell Eng. Co. Inc., Kansas City, MO, USA
  • Volume
    12
  • Issue
    2
  • fYear
    1997
  • fDate
    4/1/1997 12:00:00 AM
  • Firstpage
    1023
  • Lastpage
    1028
  • Abstract
    The regulatory and market forces that are challenging the electric utility industry require more proactive methods of utility asset management. An important component of asset management for electric utilities is the maintenance of existing power transmission lines. Therefore, some utilities are working to implement a condition-based, predictive transmission line maintenance program using the concepts of reliability centered maintenance
  • Keywords
    electricity supply industry; maintenance engineering; power system reliability; power transmission lines; transmission networks; asset management; condition-based predictive maintenance; electric utility industry; power transmission lines; reliability centered maintenance; transmission systems; Asset management; Costs; Power industry; Power quality; Power system reliability; Power transmission lines; Predictive maintenance; Reliability theory; Safety; Transmission line theory;
  • fLanguage
    English
  • Journal_Title
    Power Delivery, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0885-8977
  • Type

    jour

  • DOI
    10.1109/61.584432
  • Filename
    584432