DocumentCode :
1551427
Title :
Interruptible load analysis using sequential Monte Carlo simulation
Author :
Chen, H. ; Billinton, R.
Author_Institution :
Power Syst. Res. Group, Saskatchewan Univ., Saskatoon, Sask., Canada
Volume :
148
Issue :
6
fYear :
2001
fDate :
11/1/2001 12:00:00 AM
Firstpage :
535
Lastpage :
539
Abstract :
Electric utilities are increasingly examining cost-effective opportunities to utilise demand-side management initiatives, such as interruptible contracts to reduce the need for additional capacity. Techniques are presented for conducting interruptible load analysis using sequential Monte Carlo Simulation. A bisection search approach was developed to effectively determine the interruptible load carrying capability. An index, designated the avoidable additional generating capacity, is proposed and a procedure to calculate it is presented. Numerical studies were performed to indicate the possible applications of the proposed techniques
Keywords :
Monte Carlo methods; demand side management; electricity supply industry; load (electric); power generation reliability; avoidable additional generating capacity; bisection search approach; demand side management; electric utilities; generation capacity adequacy; interruptible contracts; interruptible load analysis; sequential Monte Carlo simulation; supply reliability;
fLanguage :
English
Journal_Title :
Generation, Transmission and Distribution, IEE Proceedings-
Publisher :
iet
ISSN :
1350-2360
Type :
jour
DOI :
10.1049/ip-gtd:20010582
Filename :
968471
Link To Document :
بازگشت