DocumentCode :
1554987
Title :
Equivalent load test for induction machines-the forward short circuit test
Author :
Plevin, D.H. ; Glew, C.N. ; Dymond, J.H.
Author_Institution :
GEC Alsthom Large Machines Ltd., Rugby, UK
Volume :
14
Issue :
3
fYear :
1999
fDate :
9/1/1999 12:00:00 AM
Firstpage :
419
Lastpage :
425
Abstract :
Often full load testing of induction machines with outputs greater than 1 MW present difficulties when attempting to verify the rated performance, especially the temperature rise. This is because of limitations imposed by the manufacturer´s power supplies and load equipment. The forward short circuit test, as an equivalent load test, is an alternate loading method which most manufacturers and service facilities could employ with a minimum capital expenditure. The theory of the method is described and temperature rise test results from a 1960 kW 4 pole machine are compared with test results obtained using several other test methods
Keywords :
asynchronous machines; load (electric); machine testing; temperature measurement; 1960 kW; equivalent load test; forward short circuit test; induction machines; loading method; rated performance verification; temperature rise tests; Circuit testing; Costs; Forward contracts; IEC standards; Induction machines; Induction motors; Manufacturing industries; Samarium; System testing; Temperature;
fLanguage :
English
Journal_Title :
Energy Conversion, IEEE Transactions on
Publisher :
ieee
ISSN :
0885-8969
Type :
jour
DOI :
10.1109/60.790891
Filename :
790891
Link To Document :
بازگشت