Title :
Uncertainty network planning methodology based on the connection number a+bi+cj
Author :
Huang, Decai ; Zhao, Keqin
Author_Institution :
Coll. of Inf. Eng., Zhejiang Univ. of Technol., Hangzhou, China
Volume :
4
fYear :
2004
Firstpage :
2863
Abstract :
The connection number a+bi+cj, a new kind of number introduced in set pair analysis (SPA) theory, was used in uncertain network planning methodology to represent the uncertainty and delay of working procedure time. It is caused by random, fuzzy, indeterminate-known or unforeseen factors and unexpected incident in a project. The concepts of primary critical paths, secondary critical paths and third critical paths with the classifying method of critical paths in uncertainty environment were introduced. A new uncertainty network planning method is constructed, which is different from the traditional concept and more consistent with the practical application. The new concept can obtain three different sets of critical paths instead of only one critical path obtained by traditional one. The illustrating examples given in this paper indicate that the new method can provide more useful information for the finish time forecasting and controlling of a project.
Keywords :
critical path analysis; set theory; uncertainty handling; critical paths; fuzzy network planning; network planning methodology; project finish time; set pair analysis theory; Delay effects; Educational institutions; Electronic mail; Fuzzy set theory; Mathematics; Path planning; Process planning; Road transportation; Technology planning; Uncertainty;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Intelligent Control and Automation, 2004. WCICA 2004. Fifth World Congress on
Print_ISBN :
0-7803-8273-0
Type :
conf
DOI :
10.1109/WCICA.2004.1343037
Filename :
1343037
Link To Document :
بازگشت