• DocumentCode
    1575582
  • Title

    A genetic algorithm with Tabu Search for multi-objective scheduling constrained flexible job shop

  • Author

    Di, Liang ; Ze, Tao

  • Author_Institution
    Sch. of Mech. Eng., Shenyang Univ., Shenyang, China
  • Volume
    2
  • fYear
    2011
  • Firstpage
    1662
  • Lastpage
    1665
  • Abstract
    A hybrid algorithm is proposed to solve scheduling problems in flexible production environment, where time, cost and equipment utilization rate are all concerned. Firstly, the scheduling model is built; the scheduling precedence is determined by the representation based operation. Objective dimensions can be unified by standardization principle. Secondly, AHP application is adopted to translate multi-objective into single objective problem. In order to avoid the premature convergence of simple GA, it combines the advantage of global search ability of GA with the self-adaptive merit of Tabu Search (TS). The result of the test shows that this method is feasible and efficient.
  • Keywords
    costing; decision making; flexible manufacturing systems; genetic algorithms; job shop scheduling; production control; search problems; AHP application; GA; constrained flexible job shop scheduling; cost utilization; equipment utilization rate; flexible production environment; genetic algorithm; global search ability; hybrid algorithm; multiobjective scheduling; tabu search; time utilization; Optimization; flexible job shop scheduling; hybrid genetic-tabu Search algorithm; multi-objective optimization;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Cross Strait Quad-Regional Radio Science and Wireless Technology Conference (CSQRWC), 2011
  • Conference_Location
    Harbin
  • Print_ISBN
    978-1-4244-9792-8
  • Type

    conf

  • DOI
    10.1109/CSQRWC.2011.6037295
  • Filename
    6037295