DocumentCode
1576295
Title
Multi-interval optimization for real-time power system scheduling in the Ontario electricity market
Author
Yu, Chien-Ning ; Cohen, Arthur I. ; Danai, Behnam
Author_Institution
ABB Inc., Santa Clara, CA, USA
fYear
2005
Firstpage
2717
Abstract
The Ontario IMO market operation system software that determines the real-time (5-minute) dispatch instructions has been enhanced to optimize over a number of intervals. Optimizing over a rolling period of up to 1 hour ahead provides more reliable and economic operation by taking into account upcoming demand and system condition changes without need for manual operator intervention. Multi-interval optimization (MIO) makes dispatch advisories available to market participants for future dispatch instructions, which helps them to efficiently manage their units and allows them to be better able to follow their dispatch instructions. Based on the first five months of operation experience, MIO has improved unit scheduling and stability of the IMO network. It also reduces the amount of operator manual intervention and, therefore, leads to more transparent market operation.
Keywords
optimisation; power engineering computing; power generation dispatch; power generation scheduling; power markets; Ontario; dispatch advisories; electricity market; future dispatch instructions; multiinterval optimization market operation system software; real-time power system scheduling; transparent market operation; unit scheduling; Electricity supply industry; Manuals; Power generation economics; Power system economics; Power system reliability; Power systems; Real time systems; Scheduling; Stability; System software;
fLanguage
English
Publisher
ieee
Conference_Titel
Power Engineering Society General Meeting, 2005. IEEE
Print_ISBN
0-7803-9157-8
Type
conf
DOI
10.1109/PES.2005.1489347
Filename
1489347
Link To Document