Title :
Concorda — An integrated power systems analysis suite
Author :
Venkataraman, Sundar ; Jordan, Gary ; Zandt, Van
Author_Institution :
GE Energy, Schenectady, NY, USA
Abstract :
Recently, ISO/RTOs have started conducting long-term regional planning studies to identify their system´s capability to reliably serve load over the long term. A variety of studies is performed in the regional planning process to address the needs of the electrical system as a whole over the planning period, not just the needs for the transmission system. Each study has a specific purpose, but results from all the studies need to be integrated to obtain meaningful information. Fundamentally new analytical tools are not required for planning in a deregulated environment; however, the existing tools need to be better integrated. GE is addressing the needs of ISO/RTO planning community by integrating its existing power system analysis software so that they can seamlessly work together.
Keywords :
power transmission planning; power transmission reliability; ISO-RTO planning community; deregulated environment; electrical system; independent system operator; integrated power system analysis; long-term regional planning; regional transmission operator; reliability assessment; Councils; ISO; Power generation; Power system analysis computing; Power system interconnection; Power system planning; Power system reliability; Power system simulation; Process planning; Solar power generation; Integrated Generation and Transmission; Planning; Power Flow Analysis; Production Simulation; Reliability Assessment;
Conference_Titel :
Power & Energy Society General Meeting, 2009. PES '09. IEEE
Conference_Location :
Calgary, AB
Print_ISBN :
978-1-4244-4241-6
DOI :
10.1109/PES.2009.5275302