• DocumentCode
    1577722
  • Title

    Concorda — An integrated power systems analysis suite

  • Author

    Venkataraman, Sundar ; Jordan, Gary ; Zandt, Van

  • Author_Institution
    GE Energy, Schenectady, NY, USA
  • fYear
    2009
  • Firstpage
    1
  • Lastpage
    6
  • Abstract
    Recently, ISO/RTOs have started conducting long-term regional planning studies to identify their system´s capability to reliably serve load over the long term. A variety of studies is performed in the regional planning process to address the needs of the electrical system as a whole over the planning period, not just the needs for the transmission system. Each study has a specific purpose, but results from all the studies need to be integrated to obtain meaningful information. Fundamentally new analytical tools are not required for planning in a deregulated environment; however, the existing tools need to be better integrated. GE is addressing the needs of ISO/RTO planning community by integrating its existing power system analysis software so that they can seamlessly work together.
  • Keywords
    power transmission planning; power transmission reliability; ISO-RTO planning community; deregulated environment; electrical system; independent system operator; integrated power system analysis; long-term regional planning; regional transmission operator; reliability assessment; Councils; ISO; Power generation; Power system analysis computing; Power system interconnection; Power system planning; Power system reliability; Power system simulation; Process planning; Solar power generation; Integrated Generation and Transmission; Planning; Power Flow Analysis; Production Simulation; Reliability Assessment;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power & Energy Society General Meeting, 2009. PES '09. IEEE
  • Conference_Location
    Calgary, AB
  • ISSN
    1944-9925
  • Print_ISBN
    978-1-4244-4241-6
  • Type

    conf

  • DOI
    10.1109/PES.2009.5275302
  • Filename
    5275302