DocumentCode :
1577798
Title :
Transmission evaluation of large new renewable generation interconnections at the california ISO
Author :
Chowdhury, A.A. ; Zhang, Yi ; Liu, Haifeng ; Zhu, Songzhe ; Le, David
fYear :
2009
Firstpage :
1
Lastpage :
7
Abstract :
The CAISO has launched a Renewables Integration Study to assess the impact of renewable resources on the system. This study was initiated to determine if there are any performance related issues associated with the implementation of the Renewables Portfolio Standards (RPS). The RPS mandates utilities and other load serving entities to procure 20 percent of their customers´ electricity needs from renewable power by 2010. Meanwhile, many system impact studies have been performed by the CAISO for new wind generation interconnections submitted by developers. This paper outlines the studies that were done at the CAISO as part of the transmission planning process; the methodologies and assumptions to perform these studies; and a summary of the conclusions derived from the studies.
Keywords :
ISO standards; power generation planning; power system interconnection; wind power plants; CAISO transmission planning process; California ISO; renewable generation interconnection; renewable portfolio standards; wind generation interconnections; ISO; Large-scale systems; Portfolios; Power system interconnection; Power system modeling; Power system planning; Solar power generation; Wind energy generation; Wind power generation; Wind turbines; CAISO; Renewable Integration; Transmission Planning; Wind Generation Interconnection;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Power & Energy Society General Meeting, 2009. PES '09. IEEE
Conference_Location :
Calgary, AB
ISSN :
1944-9925
Print_ISBN :
978-1-4244-4241-6
Type :
conf
DOI :
10.1109/PES.2009.5275305
Filename :
5275305
Link To Document :