DocumentCode
1578490
Title
Determination of construction priority of transmission lines based on probabilistic reliability evaluation
Author
Tran, TrungTinh ; Choi, Jaeseok ; Thomas, R.
Author_Institution
Dept. of Electr. Eng., Gyeongsang Nat. Univ., South Korea
fYear
2005
Firstpage
2542
Abstract
This paper proposes a method for determining the construction priority of transmission lines based on probabilistic reliability evaluation. This method suggests the priority for constructing lines from new transmission lines set of optimal solution obtained by the optimal transmission expansion planning. In this study, the optimality is solved by integer programming using branch and bound method, which utilizes a network flow approach and the maximum flow-minimum cut set theorem to minimize investment budget of transmission line construction and subject to deterministic criterion using a program Cmexp.For. The timing priority of new line construction is determined on the comparison of probabilistic reliability indices of each new system using TRELSS 6.2 program. The proposed method has been tested on IEEE-MRTS.
Keywords
integer programming; power engineering computing; power transmission lines; power transmission planning; power transmission reliability; probability; tree searching; Cmexp.For program; IEEE-MRTS; TRELSS 6.2 program; branch and bound method; construction priority; integer programming; network flow approach; probabilistic reliability evaluation; transmission expansion planning; transmission lines; Costs; Investments; Linear programming; Power system economics; Power system planning; Power system reliability; Power transmission lines; Timing; Transmission line theory; Transmission lines;
fLanguage
English
Publisher
ieee
Conference_Titel
Power Engineering Society General Meeting, 2005. IEEE
Print_ISBN
0-7803-9157-8
Type
conf
DOI
10.1109/PES.2005.1489432
Filename
1489432
Link To Document