• DocumentCode
    1579366
  • Title

    Effect of market structure and design on grid reliability

  • Author

    Alaywan, Ziad

  • Author_Institution
    ISO, CA, USA
  • fYear
    2005
  • Firstpage
    945
  • Abstract
    This paper argues that the Independent System Operator (ISO) should play a major role in designing a viable electricity market. It cites the case of the California energy crisis, where CAISO was marginalized and was not provided with the necessary tools to effectively manage the imbalance requirements as well as simultaneously manage congestion. It also suggests that modeling the physical aspect of the grid as the foundation to an electric market is the right way to operate an efficient and reliable ISO.
  • Keywords
    power grids; power markets; power system management; power system reliability; California energy crisis; Independent System Operator; congestion management; electricity market; grid reliability; Energy management; History; ISO standards; Maintenance; Physics; Pricing; Proposals; Public policy; Regulators; Signal design;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power Engineering Society General Meeting, 2005. IEEE
  • Print_ISBN
    0-7803-9157-8
  • Type

    conf

  • DOI
    10.1109/PES.2005.1489466
  • Filename
    1489466