• DocumentCode
    1580727
  • Title

    Train-interlocked control at centralized signalized intersection

  • Author

    Kawagoe, Ichiro

  • Author_Institution
    Traffic Regulation Sect., Shiga Prefectural Police HQ, Ohtsu, Japan
  • fYear
    1999
  • fDate
    6/21/1905 12:00:00 AM
  • Firstpage
    489
  • Lastpage
    494
  • Abstract
    At a centralized signal intersection in the central business district of an urban area in Shiga Prefecture, the Shiga Prefectural Police HQ has been promoting the securing of safe and smooth traffic by implementing both multi-phase control and train-interlocked control with the emphasis on the safety of trains, motor vehicles, and pedestrians. This paper introduces the configuration, functions and operations of this train-interlocked control system operating satisfactorily at the centralized signal intersection
  • Keywords
    automated highways; rail traffic; road traffic; traffic control; Shiga Prefecture; central business district; centralized signalized intersection; motor vehicles; multiphase control; pedestrians; safety; train-interlocked control; urban area; Centralized control; Cities and towns; Control systems; Lakes; Phase control; Rail transportation; Railway safety; Road vehicles; Smoothing methods; Vehicle safety;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Intelligent Transportation Systems, 1999. Proceedings. 1999 IEEE/IEEJ/JSAI International Conference on
  • Conference_Location
    Tokyo
  • Print_ISBN
    0-7803-4975-X
  • Type

    conf

  • DOI
    10.1109/ITSC.1999.821106
  • Filename
    821106