• DocumentCode
    1582087
  • Title

    Integration of the real time levels of a multilevel hierarchical control; application to a flexible assembly cell

  • Author

    Esteban, P. ; Briand, C. ; Courvoisier, M.

  • Author_Institution
    Lab. d´´Automatique et d´´Analyse des Syst. CNRS, Toulouse, France
  • fYear
    1993
  • fDate
    6/15/1905 12:00:00 AM
  • Firstpage
    407
  • Lastpage
    412
  • Abstract
    The authors present a conception approach for distributed control of flexible manufacturing system (FMS). This control is based on five levels, with specific attributes: the long term planning level; the forecast scheduling level; the supervision level; the sub-sets coordination level; and the local control level. By nature, the two first ones are nonreal-time control levels. Conversely, the other levels are heavily constrained by manufacturing real time events. The specific competences of each level are defined, but the integration method to obtain the best cooperation between these specialities has to be described: this last point composes the main aim of this paper.
  • Keywords
    assembling; distributed control; flexible manufacturing systems; hierarchical systems; real-time systems; FMS; assembly; competences; distributed control; flexible manufacturing system; forecast scheduling; integration; local control; long term planning; multilevel hierarchical control; real time; sub-sets coordination; supervision; Assembly; Contracts; Distributed control; Flexible manufacturing systems; Job shop scheduling; Joining processes; Logic; Manufacturing processes; Production planning; Routing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Industrial Electronics, 1993. Conference Proceedings, ISIE'93 - Budapest., IEEE International Symposium on
  • Conference_Location
    Budapest, Hungary
  • Print_ISBN
    0-7803-1227-9
  • Type

    conf

  • DOI
    10.1109/ISIE.1993.268771
  • Filename
    268771