DocumentCode
1584893
Title
Automatic impulse voltage routine testing of distribution transformers
Author
Furrer, L. ; Kurz, S. ; Loppacher, M.
Author_Institution
Haefely Trench AG, Basel, Switzerland
Volume
4
fYear
1999
fDate
6/21/1905 12:00:00 AM
Firstpage
288
Abstract
Distribution transformers are often produced by highly automated production lines. Overall factory throughputs for small transformers sometimes reach one unit per minute. This throughput requires a fully automatic impulse test system capable of generating and analysing an impulse even few seconds. In addition, production information has to be integrated and verified by a host computer retrieving instantaneous pass/fail information from the impulse test system. High speed, high system reliability and correct pass/fail decisions are the challenges in implementing such an automated test system. In future, sophisticated analysis tools such as coherence and transfer functions with tolerance bands could be implemented. This allows a further refinement of pass/fail decisions which have to be investigated
Keywords
distribution networks; automated production lines; automatic impulse voltage routine testing; coherence; distribution transformers; instantaneous pass/fail information; pass/fail decisions; reliability; tolerance bands; transfer functions;
fLanguage
English
Publisher
iet
Conference_Titel
High Voltage Engineering, 1999. Eleventh International Symposium on (Conf. Publ. No. 467)
Conference_Location
London
ISSN
0537-9989
Print_ISBN
0-85296-719-5
Type
conf
DOI
10.1049/cp:19990849
Filename
821277
Link To Document