DocumentCode
1585457
Title
Employing optimization method to determine the production plan in the plan environmental impact assessment of a petrochemical development district
Author
Shu, Lin ; Fantang, Zeng ; Hengjun, Zhang ; Jieer, Xiao ; Ting, Yu ; Shucong, Lin
Author_Institution
Water Environment Model and Pollution Control Dept., South China Institute of Environmental Science, MEP., Guangzhou, China
fYear
2012
Firstpage
1
Lastpage
4
Abstract
During implementing plan environmental impact assessment to control the potential pollution of a petrochemical development district, a problem of dealing with a complicated supply chain should be solved. By taking the factories as “points” and supply relations as “lines”, the supply chain can be reduced to “points” and “lines”. Then by defining one key product for one factory, the production amount of any non-key product or raw material can be linearly expressed by that of the key product of the same “point”. And the relation between the supply amount of an upstream factory and the need amount of its downstream factory can be expressed by inequation of the production amounts of their respective key products, called “line” constraint. After all the steps, an optimization model can be established, and an example of determining the production plan of Daya Bay District is taken. The results show that the model can well help the decision maker to get a largest profit without serious pollution.
Keywords
environmental impact assessment; optimization; petrochemical industry; supply chain;
fLanguage
English
Publisher
ieee
Conference_Titel
World Automation Congress (WAC), 2012
Conference_Location
Puerto Vallarta, Mexico
ISSN
2154-4824
Print_ISBN
978-1-4673-4497-5
Type
conf
Filename
6321488
Link To Document