• DocumentCode
    1587288
  • Title

    Specification of GIS substations and equipment

  • Author

    Becker, George ; Koch, Hermann

  • fYear
    2005
  • Firstpage
    931
  • Abstract
    It is useful to start a GIS project with a brief description of the planning and the engineering process. Typically, the process starts with the network planning performed by the system engineers. It is therefore important that the system planning engineers possess a certain minimum knowledge of GIS to be able to utilize the benefits of this technology.
  • Keywords
    gas insulated substations; gas insulated switchgear; planning; GIS substations; gas insulated substation; gas insulated switchgear; network planning; Documentation; Geographic Information Systems; Manufacturing; Power Switchgear - c37; Power system protection; Process planning; Substations; Switches; Systems engineering and theory; Transformers;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power Engineering Society General Meeting, 2005. IEEE
  • Print_ISBN
    0-7803-9157-8
  • Type

    conf

  • DOI
    10.1109/PES.2005.1489767
  • Filename
    1489767