DocumentCode
1587288
Title
Specification of GIS substations and equipment
Author
Becker, George ; Koch, Hermann
fYear
2005
Firstpage
931
Abstract
It is useful to start a GIS project with a brief description of the planning and the engineering process. Typically, the process starts with the network planning performed by the system engineers. It is therefore important that the system planning engineers possess a certain minimum knowledge of GIS to be able to utilize the benefits of this technology.
Keywords
gas insulated substations; gas insulated switchgear; planning; GIS substations; gas insulated substation; gas insulated switchgear; network planning; Documentation; Geographic Information Systems; Manufacturing; Power Switchgear - c37; Power system protection; Process planning; Substations; Switches; Systems engineering and theory; Transformers;
fLanguage
English
Publisher
ieee
Conference_Titel
Power Engineering Society General Meeting, 2005. IEEE
Print_ISBN
0-7803-9157-8
Type
conf
DOI
10.1109/PES.2005.1489767
Filename
1489767
Link To Document