• DocumentCode
    158956
  • Title

    High voltage performance of BARC-TIFR Pelletron accelerator

  • Author

    Surendran, P. ; Ansari, Q.N. ; Nair, J.P. ; Sharma, S.C. ; Vishwakarma, R.S. ; Matkar, U.V. ; Ramjilal ; Ninawe, N.G. ; Lokre, R.N. ; Yadav, M.L. ; Yadav, J.K. ; Sparrow, H. ; Gupta, Amit Kumar

  • Author_Institution
    Nucl. Phys. Div., BARC, Mumbai, India
  • fYear
    2014
  • fDate
    Sept. 28 2014-Oct. 3 2014
  • Firstpage
    669
  • Lastpage
    671
  • Abstract
    The 14 UD Pelletron Accelerator at TIFR, Mumbai is operational since its inception in 1988. It was decided to impart enough time for High voltage conditioning to achieve higher operational voltage. Prior to this, comprehensive works such as replacing all the sputter ion Pumps and Titanium sublimation pumps across the Accelerator tube with new or refurbished ones and replacement of Alumina balls in the SF6 drier with fresh balls were carried out. High voltage conditioning of each module was done. Further conditioning of two modules at a time in overlapping mode improved the terminal voltage. As a result of this rigorous conditioning Terminal voltage of 12.6 MV was achieved and beam has been delivered to users at 12MV terminal. Details of this effort will be presented in this paper.
  • Keywords
    electrostatic accelerators; titanium; BARC-TIFR pelletron accelerator; Mumbai; SF6 drier; accelerator tube; alumina balls; high voltage conditioning; overlapping mode; rigorous conditioning terminal voltage; sputter ion Pumps; titanium sublimation pumps; Acceleration; Electric potential; Electrodes; Electron tubes; Resistors; Sulfur hexafluoride; Voltage measurement;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Discharges and Electrical Insulation in Vacuum (ISDEIV), 2014 International Symposium on
  • Conference_Location
    Mumbai
  • Print_ISBN
    978-1-4799-6750-6
  • Type

    conf

  • DOI
    10.1109/DEIV.2014.6961771
  • Filename
    6961771