DocumentCode :
1592794
Title :
Performance measurement of selected heuristic algorithms for solving scheduling problems
Author :
Modrak, V. ; Semanco, P. ; Kulpa, W.
Author_Institution :
Fac. of Manuf. Technol. with seat in Presov, Tech. Univ. of Kosice, Presov, Slovakia
fYear :
2013
Firstpage :
205
Lastpage :
209
Abstract :
The problem of scheduling in a Flow Shop is considered with the objective of minimizing the makespan for static problems. This paper compares the most common heuristics methods, namely CDS, Palmer´s Slope index, Gupta´s algorithm and so called MOD algorithm, for scheduling on the variety size of problem data sets and their impact on CPU time. The computational experiment includes 12 of available benchmark data sets of 10 problems proposed by Taillard. The results are computed and presented in the form of relative percentage deviation with the boundaries to the reference heuristic, namely NEH algorithm. Computational experiments are conducted to evaluate the impact of scheduling problem datasets of n-job and m-machine in flow-shop on CPU time.
Keywords :
flow shop scheduling; CDS; Gupta algorithm; MOD algorithm; NEH algorithm; Palmer slope index; flow shop scheduling problems; heuristic algorithms; makespan minimization; performance measurement; relative percentage deviation; Heuristic algorithms; Indexes; Job shop scheduling; Processor scheduling; Schedules; Search problems;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Applied Machine Intelligence and Informatics (SAMI), 2013 IEEE 11th International Symposium on
Conference_Location :
Herl´any
Print_ISBN :
978-1-4673-5928-3
Electronic_ISBN :
978-1-4673-5927-6
Type :
conf
DOI :
10.1109/SAMI.2013.6480977
Filename :
6480977
Link To Document :
بازگشت