DocumentCode
1594784
Title
Research on Requirement Forecasting of Raw Materials for Boiler Manufacturing Enterprise Based on Exponential Smoothing Method
Author
Du Yanwei
Author_Institution
Sch. of Mechatron. Eng., Xi´an Technol. Univ., Xi´an, China
Volume
3
fYear
2010
Firstpage
219
Lastpage
222
Abstract
The best purchases of raw materials of manufacturing enterprises can be determined by accurate requirement forecasting to decide order quantities. According to the characteristics of the boiler manufacturers, the weighted coefficients and initial values ware chose which have a direct impact on the forecasting results. The exponential smoothing model was applied to predict the requirement of raw materials. The mean square error was calculated. The prediction model was verified by example. The error between the forecasting results and the actual needs is smaller. The exponential smoothing model was proved to be effective for boiler manufacturers to forecast requirement of raw materials.
Keywords
boilers; exponential distribution; forecasting theory; inventory management; manufacturing industries; raw materials; boiler manufacturing enterprise; exponential smoothing method; inventory management; mean square error; raw materials; requirement forecasting; Boilers; Demand forecasting; Economic forecasting; Manufacturing; Predictive models; Procurement; Production; Raw materials; Smoothing methods; Time series analysis; exponential smoothing; manufacturing enterprises; raw materials; requirement forecasting; weighting coefficients;
fLanguage
English
Publisher
ieee
Conference_Titel
Computer Modeling and Simulation, 2010. ICCMS '10. Second International Conference on
Conference_Location
Sanya, Hainan
Print_ISBN
978-1-4244-5642-0
Electronic_ISBN
978-1-4244-5643-7
Type
conf
DOI
10.1109/ICCMS.2010.418
Filename
5421213
Link To Document