• DocumentCode
    1594784
  • Title

    Research on Requirement Forecasting of Raw Materials for Boiler Manufacturing Enterprise Based on Exponential Smoothing Method

  • Author

    Du Yanwei

  • Author_Institution
    Sch. of Mechatron. Eng., Xi´an Technol. Univ., Xi´an, China
  • Volume
    3
  • fYear
    2010
  • Firstpage
    219
  • Lastpage
    222
  • Abstract
    The best purchases of raw materials of manufacturing enterprises can be determined by accurate requirement forecasting to decide order quantities. According to the characteristics of the boiler manufacturers, the weighted coefficients and initial values ware chose which have a direct impact on the forecasting results. The exponential smoothing model was applied to predict the requirement of raw materials. The mean square error was calculated. The prediction model was verified by example. The error between the forecasting results and the actual needs is smaller. The exponential smoothing model was proved to be effective for boiler manufacturers to forecast requirement of raw materials.
  • Keywords
    boilers; exponential distribution; forecasting theory; inventory management; manufacturing industries; raw materials; boiler manufacturing enterprise; exponential smoothing method; inventory management; mean square error; raw materials; requirement forecasting; Boilers; Demand forecasting; Economic forecasting; Manufacturing; Predictive models; Procurement; Production; Raw materials; Smoothing methods; Time series analysis; exponential smoothing; manufacturing enterprises; raw materials; requirement forecasting; weighting coefficients;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Computer Modeling and Simulation, 2010. ICCMS '10. Second International Conference on
  • Conference_Location
    Sanya, Hainan
  • Print_ISBN
    978-1-4244-5642-0
  • Electronic_ISBN
    978-1-4244-5643-7
  • Type

    conf

  • DOI
    10.1109/ICCMS.2010.418
  • Filename
    5421213