DocumentCode
1595399
Title
Resource Scheduling Algorithm of Space Objects Surveillance for Collision Warning
Author
Bo, Li ; Daqi, Li
Author_Institution
Beijing Aerosp. Control Center, Beijing, China
fYear
2012
Firstpage
736
Lastpage
739
Abstract
Space objects surveillance for collision warning is a constraint satisfaction scheduling problem of multiple targets measurement. This paper summarizes the various factors in the scheduling process and proposes the mathematical model of non-cooperative measurement resource scheduling system. The heuristic scheduling algorithms and fuzzy evaluation method is applied to non-cooperative resource scheduling and achieve effective scheduling result.
Keywords
collision avoidance; scheduling; target tracking; collision warning; constraint satisfaction scheduling problem; fuzzy evaluation method; heuristic scheduling algorithms; mathematical model; multiple targets measurement; resource scheduling algorithm; space objects surveillance; Current measurement; Extraterrestrial measurements; Orbits; Radar tracking; Space vehicles; Target tracking; Time measurement; CollisionWarning; Resource Scheduling; SpaceObjects;
fLanguage
English
Publisher
ieee
Conference_Titel
Intelligent System Design and Engineering Application (ISDEA), 2012 Second International Conference on
Conference_Location
Sanya, Hainan
Print_ISBN
978-1-4577-2120-5
Type
conf
DOI
10.1109/ISdea.2012.474
Filename
6173311
Link To Document