• DocumentCode
    1595399
  • Title

    Resource Scheduling Algorithm of Space Objects Surveillance for Collision Warning

  • Author

    Bo, Li ; Daqi, Li

  • Author_Institution
    Beijing Aerosp. Control Center, Beijing, China
  • fYear
    2012
  • Firstpage
    736
  • Lastpage
    739
  • Abstract
    Space objects surveillance for collision warning is a constraint satisfaction scheduling problem of multiple targets measurement. This paper summarizes the various factors in the scheduling process and proposes the mathematical model of non-cooperative measurement resource scheduling system. The heuristic scheduling algorithms and fuzzy evaluation method is applied to non-cooperative resource scheduling and achieve effective scheduling result.
  • Keywords
    collision avoidance; scheduling; target tracking; collision warning; constraint satisfaction scheduling problem; fuzzy evaluation method; heuristic scheduling algorithms; mathematical model; multiple targets measurement; resource scheduling algorithm; space objects surveillance; Current measurement; Extraterrestrial measurements; Orbits; Radar tracking; Space vehicles; Target tracking; Time measurement; CollisionWarning; Resource Scheduling; SpaceObjects;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Intelligent System Design and Engineering Application (ISDEA), 2012 Second International Conference on
  • Conference_Location
    Sanya, Hainan
  • Print_ISBN
    978-1-4577-2120-5
  • Type

    conf

  • DOI
    10.1109/ISdea.2012.474
  • Filename
    6173311