DocumentCode :
1595399
Title :
Resource Scheduling Algorithm of Space Objects Surveillance for Collision Warning
Author :
Bo, Li ; Daqi, Li
Author_Institution :
Beijing Aerosp. Control Center, Beijing, China
fYear :
2012
Firstpage :
736
Lastpage :
739
Abstract :
Space objects surveillance for collision warning is a constraint satisfaction scheduling problem of multiple targets measurement. This paper summarizes the various factors in the scheduling process and proposes the mathematical model of non-cooperative measurement resource scheduling system. The heuristic scheduling algorithms and fuzzy evaluation method is applied to non-cooperative resource scheduling and achieve effective scheduling result.
Keywords :
collision avoidance; scheduling; target tracking; collision warning; constraint satisfaction scheduling problem; fuzzy evaluation method; heuristic scheduling algorithms; mathematical model; multiple targets measurement; resource scheduling algorithm; space objects surveillance; Current measurement; Extraterrestrial measurements; Orbits; Radar tracking; Space vehicles; Target tracking; Time measurement; CollisionWarning; Resource Scheduling; SpaceObjects;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Intelligent System Design and Engineering Application (ISDEA), 2012 Second International Conference on
Conference_Location :
Sanya, Hainan
Print_ISBN :
978-1-4577-2120-5
Type :
conf
DOI :
10.1109/ISdea.2012.474
Filename :
6173311
Link To Document :
بازگشت