DocumentCode
1598781
Title
Catering for electromagnetic compatibility requirements in the project plans of products
Author
Venter, F.A.
Author_Institution
Div. of Eng., Alcatel Altech Telecoms, Boksburg, South Africa
Volume
2
fYear
1999
fDate
6/21/1905 12:00:00 AM
Firstpage
1131
Abstract
This paper addresses the main issues that one needs to take into account when drafting project plans for new products, where EMC requirements have to be incorporated. It is also shown why these guidelines must be implemented as early in the product development cycle as possible. Some practical problems with introducing EMC requirements during the final project stages are also be given
Keywords
electromagnetic compatibility; planning; product development; project engineering; EMC requirements; electromagnetic compatibility; new products; practical problems; product development cycle; project plans; Cost function; Crystals; Electromagnetic compatibility; Frequency; Gaskets; Guidelines; Microprocessors; Product development; Production; Time measurement;
fLanguage
English
Publisher
ieee
Conference_Titel
Africon, 1999 IEEE
Conference_Location
Cape Town
Print_ISBN
0-7803-5546-6
Type
conf
DOI
10.1109/AFRCON.1999.821935
Filename
821935
Link To Document