DocumentCode :
1602072
Title :
Operational tests on thyristor valves for Ningdong-Shandong ±660kV UHVDC project
Author :
Tang, G.F. ; Zha, K.P. ; Wen, J.L. ; Gao, CH ; Zhang, X.G. ; Wang, G.Y. ; Jackson, David ; Cao, J.Z.
Author_Institution :
China Electr. Power Res. Inst., Beijing, China
fYear :
2010
Firstpage :
1
Lastpage :
6
Abstract :
For purchasing more efficiency, more power transmission capacity, UHVDC projects are employed in the gird of China. Thyristor valves, as one of the key equipments, must pass the operational tests in order to make sure the valve design is proper. In coordinate with IEC60700-1 standards and based on thorough investigation and comparison of exiting operational test circuits, a new operational tests circuit is developed and applied in the Ningdong-Shandong ±660kV UHVDC project. In this paper, the topology and working principle of the test circuit are introduced. Then test parameters and results are presented, showing that development of thyristor valves for Ningdong-Shandong UHVDC project is successful.
Keywords :
HVDC power transmission; IEC standards; IEC60700-1 standards; Ningdong-Shandong UHVDC project; power transmission capacity; thyristor valves; voltage -660 kV; voltage 660 kV; Heating; Neodymium; Valves; ±660kV; UHVDC; operational test; synthetic test method; thyristor valve; type test;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Power System Technology (POWERCON), 2010 International Conference on
Conference_Location :
Hangzhou
Print_ISBN :
978-1-4244-5938-4
Type :
conf
DOI :
10.1109/POWERCON.2010.5666020
Filename :
5666020
Link To Document :
بازگشت