• DocumentCode
    1605010
  • Title

    Engineering-to-manufacturing-to-field test strategies status report 1992

  • Author

    Williams, Roger L.

  • Author_Institution
    Boeing Defense & Space Group, Seattle, WA, USA
  • fYear
    1992
  • Firstpage
    313
  • Lastpage
    318
  • Abstract
    This study is an interim status report on implementation of a company wide continuous quality improvement (CQI) total quality management (TQM) initiative dealing with cost, technology, and organizational problems associated with development and transfer of electronics/avionics test strategies from prime equipment design to manufacturing test and subsequently to depot level maintenance. This interim status report highlights the concerns, problems, and tentative solutions to implementing a company wide common automated test equipment (ATE) architecture for commercial airlines and for military programs.<>
  • Keywords
    aerospace computing; aircraft instrumentation; automatic test equipment; design for testability; economics; electronic equipment testing; maintenance engineering; military computing; military equipment; production testing; quality control; ATE; automated test equipment; commercial airlines; continuous quality improvement; cost; depot level maintenance; design; electronics/avionics test strategies; manufacturing test; military programs; total quality management; weapons; Aerospace electronics; Automatic testing; Costs; Electronic equipment testing; Manufacturing; Production facilities; Software testing; Space technology; System testing; Tin;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    AUTOTESTCON '92. IEEE Systems Readiness Technology Conference, Conference Record
  • Conference_Location
    Dayton, OH, USA
  • Print_ISBN
    0-7803-0643-0
  • Type

    conf

  • DOI
    10.1109/AUTEST.1992.270097
  • Filename
    270097