DocumentCode
1609396
Title
Temporal Case-Based Reasoning for reservoir spillway gate operation recommendation
Author
Hassin, Mohd Hafiz B Mohd ; Norwawi, Norita Bt Md ; Aziz, Azizi B Ab
Author_Institution
Fac. of Inf. Technol., Univ. Utara Malaysia, Sintok, Malaysia
fYear
2006
Firstpage
1
Lastpage
4
Abstract
In the traditional decision making process, in order to solve a problem, every possible solution will be generated and evaluated. The most optimum decision will be selected. However, this approach is unsuitable for urgent decision making, due to the time needed to evaluate all option. This project propose Temporal Case Based Reasoning (TCBR) technique to support dam technician in deciding which reservoir spillway gate will be opened or closed to release excess water in order to maintain a safe water level. Previous hydrological data of Timah Tasoh Dam, State of Perlis, Malaysia were used to develop the gate operation decision support model, which covers reservoir spillway gate operation activities from year 1998 to 2004. This model was then tested, and yielded up to 89 percent decision accuracy.
Keywords
case-based reasoning; dams; decision support systems; temporal reasoning; Malaysia; State of Perlis; Timah Tasoh Dam; dam technician; decision making process; gate operation decision support model; reservoir spillway gate operation recommendation; temporal case-based reasoning; water level safety; Artificial intelligence; Decision making; Engines; Humans; Hydrology; Prototypes; Reservoirs; Safety; Sediments; Water resources;
fLanguage
English
Publisher
ieee
Conference_Titel
Computing & Informatics, 2006. ICOCI '06. International Conference on
Conference_Location
Kuala Lumpur
Print_ISBN
978-1-4244-0219-9
Electronic_ISBN
978-1-4244-0220-5
Type
conf
DOI
10.1109/ICOCI.2006.5276517
Filename
5276517
Link To Document