Title :
Testing 500 kV line relays for a series compensation upgrade
Author :
McLaren, P.G. ; Kuffel, R. ; Giesbrecht, J. ; Keerthipala, W. ; Innes, S. ; Mustaphi, K.
Author_Institution :
Manitoba HVDC Res. Centre, Winnipeg, Man., Canada
fDate :
6/15/1905 12:00:00 AM
Abstract :
The authors describe tests on the relays on a long 500 kV AC line carried out on site using the real-time digital simulator developed by the Manitoba HVDC Research Centre. The purpose of the tests was to examine the relay behavior when series compensation is inserted in the line in 1993. New settings for the relays have been found which will give adequate cover for all faults although some faults will be entirely dependent on the communication link for short clearance times.
Keywords :
compensation; digital simulation; power engineering computing; power system protection; relay protection; testing; 500 kV; AC line; Manitoba HVDC Research Centre; communication link; line relays testing; real-time digital simulator; series compensation upgrade; short clearance times; Capacitors; Circuit faults; Circuit testing; Digital relays; Energy states; HVDC transmission; Protection; Protective relaying; Substations; Varistors;
Conference_Titel :
WESCANEX 93. 'Communications, Computers and Power in the Modern Environment.' Conference Proceedings., IEEE
Conference_Location :
Saskatoon, Sask., Canada
Print_ISBN :
0-7803-1319-4
DOI :
10.1109/WESCAN.1993.270552