• DocumentCode
    161308
  • Title

    Influence of financial equivalent of supply interruption on decision making in distribution networks

  • Author

    Skala, P. ; Detrich, Vaclav ; Bucholcer, O.

  • Author_Institution
    EGU Brno, Brno, Czech Republic
  • fYear
    2014
  • fDate
    12-14 May 2014
  • Firstpage
    53
  • Lastpage
    56
  • Abstract
    This paper deals with a comparison of an optimal solution of equipping a MV distribution network when different financial equivalents of supply interruption are taken into account. The comparison elicits from the studies performed for real feeders of 22kV overhead lines and is carried out for an optimization task whose objective is allocation of telecontrolled switching elements (telecontrolled section switches and reclosers). The results are presented for a single feeder and for a representative set of real feeders.
  • Keywords
    decision making; distribution networks; optimisation; power overhead lines; switches; telecontrol; MV distribution network; decision making; financial equivalent; overhead lines; power supply interruption; telecontrolled switching elements; voltage 22 kV; Electricity; Interrupters; Investment; Nickel; Optimization; Reliability; Standards; Customer Standards; Distribution Networks; Energy Not Supplied; Optimization; Reliability; Supply Continuity;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Electric Power Engineering (EPE), Proccedings of the 2014 15th International Scientific Conference on
  • Conference_Location
    Brno
  • Type

    conf

  • DOI
    10.1109/EPE.2014.6839452
  • Filename
    6839452