Title :
The challenge of transition to fibre in the loop
Author_Institution :
BNR Europe Ltd., UK
Abstract :
The benefits of deploying existing products (switch remote unit and line multiplexer) on an SDH transport network are outlined. IT is demonstrated that it is possible to achieve a pre fiber-in-the-loop (FITL) deployment capable of providing all the services required while laying the backbone and preparing the transition to FITL system. Line multiplexers and small remote units can achieve a service rich platform. It is demonstrated that careful planning can reduce the amount of fiber rework and make network deployment more future proof
Keywords :
optical fibre subscriber loops; FITL system; SDH transport network; fibre in the loop; line multiplexer; network deployment; planning; switch remote unit; Copper; Costs; Data compression; Europe; Intelligent networks; Merging; Multiplexing; Passive optical networks; Switches; Telephony;
Conference_Titel :
Optical/Hybrid Access Networks, 1993., 5th Conference on
Conference_Location :
Montreal, Que.
Print_ISBN :
0-7803-1249-X
DOI :
10.1109/OHAN.1993.587749