DocumentCode
1618424
Title
Designing an alarm transport subsystem for the ONU loop power hubs
Author
Kamath, Ullas
Author_Institution
ADC Telecomm., Minneapolis, MN, USA
fYear
1993
Abstract
The technical and economic issues to be considered in the design of the power alarm subsystem are considered. Typical failure modes in a loop power hub installed in the outside plant are listed with discussions on the criticality of each to the network. Various methods of transporting the alarm information from the power hub to the optical network unit (ONU) are discussed, with detailed analyses on the technical merits and demerits and the cost impact of each method. DC schemes using DC voltages or currents as well as AC schemes using data channels or audio tones are discussed. Certain ideas are presented as to how to customize the power alarm subsystem design to the particular needs of a network provider
Keywords
optical communication equipment; AC schemes; DC currents; DC schemes; DC voltages; ONU; alarm transport subsystem; audio tones; costs; data channels; economics; failure modes; loop power; network provider; optical network unit; outside plant; power alarm subsystem; Costs; Design engineering; Maintenance; Optical design; Optical fiber networks; Optical network units; Power engineering and energy; Power system reliability; Reliability engineering; Telecommunication network reliability;
fLanguage
English
Publisher
ieee
Conference_Titel
Optical/Hybrid Access Networks, 1993., 5th Conference on
Conference_Location
Montreal, Que.
Print_ISBN
0-7803-1249-X
Type
conf
DOI
10.1109/OHAN.1993.587751
Filename
587751
Link To Document