DocumentCode
1618739
Title
Development of a heavy duty pulsed power generator with ten spark gap switches
Author
Liu, Z. ; Pemen, A.J.M. ; Winands, G.J.J. ; van Heesch, E.J.M. ; Yan, K.
Author_Institution
Eindhoven Univ. of Technol., Eindhoven
fYear
2007
Firstpage
355
Lastpage
355
Abstract
Summary form only given. Long lifetime heavy duty (1 GW/1 kHz) pulsed power sources become more and more attractive for industrial applications such as gas/water cleaning, etc. One critical issue associated with such kind of source is the heavy switching duty. This paper describes a multiple switches based large scale prototype setup. It consists of ten high-pressure spark gap switches and a ten-stage transmission-line-transformer (TLT). By means of the TLT, the ten spark gap switches are able to share the heavy switching duty identically and simultaneously. At the switching side, the ten spark gap switches are interconnected via the TLT, and are put into one cavitv. At the output side the TLT is put in parallel, thus it has very low output impedance, i.e. 5 Omega. This prototype has been successfully demonstrated. In this paper, the development and testing results will be presented.
Keywords
electric generators; power transformers; power transmission lines; pulsed power supplies; spark gaps; gas-water cleaning; industrial applications; long lifetime heavy duty; pulsed power generator; spark gap switches; ten-stage transmission-line-transformer; Cleaning; Gas industry; Impedance; Large-scale systems; Power generation; Prototypes; Pulse generation; Sparks; Switches; Water resources;
fLanguage
English
Publisher
ieee
Conference_Titel
Plasma Science, 2007. ICOPS 2007. IEEE 34th International Conference on
Conference_Location
Albuquerque, NM
ISSN
0730-9244
Print_ISBN
978-1-4244-0915-0
Type
conf
DOI
10.1109/PPPS.2007.4345661
Filename
4345661
Link To Document