DocumentCode :
1620240
Title :
A Quantitative Method on Choosing Equipment Procurement Project Organization Structure
Author :
Jun-feng, Sun ; Wo-ye, Liu
Author_Institution :
Six Dept., Shijiazhuang Mech. Eng. Coll., Shijiazhuang, China
fYear :
2012
Firstpage :
1935
Lastpage :
1937
Abstract :
Building institution of equipment procurement project management is an important goal of the equipment procurement institution revolutionary and choosing the right organizational structure is primary issue to achieve the goal. Based on the characteristics of the project, the paper builds the choosing model of equipment procurement project organization structure, and designs a quantitative method. Through the application example, the validity of the choosing method is proved.
Keywords :
design engineering; equipment selection; procurement; project management; equipment procurement institution revolutionary; equipment procurement project management institution; equipment procurement project organization structure choosing model; quantitative method; Indexes; Organizations; Procurement; Project management; Size measurement; Sorting; Vectors; Equipment procurement; Organizational structure; Project management;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Industrial Control and Electronics Engineering (ICICEE), 2012 International Conference on
Conference_Location :
Xi´an
Print_ISBN :
978-1-4673-1450-3
Type :
conf
DOI :
10.1109/ICICEE.2012.514
Filename :
6322805
Link To Document :
بازگشت