A dependent-chance programming model for fuzzy time-cost trade-off problem
Author :
Ke, Hua ; Ma, Weimin
Author_Institution :
Sch. of Econ. & Manage., Tongji Univ., Shanghai, China
fYear :
2009
Firstpage :
2183
Lastpage :
2186
Abstract :
In real projects, both the trade-off between the project cost and the project completion time, and the uncertainty of the environment are considerable aspects for decision-makers. However, the research on the time-cost tradeoff problem seldom concerns fuzzy environments. In this paper, a new fuzzy time-cost trade-off model with the philosophy of dependent-chance programming is proposed, in which credibility theory is applied to describe the uncertainty of activity durations. A searching method as a hybrid intelligent algorithm integrating fuzzy simulation and genetic algorithm is produced to search the optimal schedule under the given decision-making rule. The purpose of the paper is to reveal how to obtain the optimal balance of the project completion time and the project cost in fuzzy environment.
Keywords :
decision making; fuzzy set theory; genetic algorithms; project management; scheduling; search problems; credibility theory; decision making; dependent-chance programming; fuzzy simulation; fuzzy time-cost trade-off problem; genetic algorithm; intelligent algorithm; optimal schedule searching; project completion time; project cost; searching method; Algorithm design and analysis; Cost function; Decision making; Fuzzy set theory; Fuzzy sets; Genetic algorithms; Instruments; Optimal scheduling; Stochastic processes; Uncertainty;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Fuzzy Systems, 2009. FUZZ-IEEE 2009. IEEE International Conference on
Conference_Location :
Jeju Island
ISSN :
1098-7584
Print_ISBN :
978-1-4244-3596-8
Electronic_ISBN :
1098-7584
Type :
conf
DOI :
10.1109/FUZZY.2009.5277068
Filename :
5277068
Link To Document :
بازگشت